![]() |
LEARN THE RIVER (LTR) Save photos to rebuild page for Greens Bridge launch site. |
REVISE THIS PAGE FOR GREENS BRIDGE LAUNCH SITE. MAY 3, 2025 has been scheduled for the first LTR in 2025 Stayton Bridge Ramp to Green Bridge Ramp. Flotilla launch at Stayton Bridge scheduled for 10:00 AM * * * * * * * * * * * * * * The following are tentative LTR dates for June, July and August 2025. Posted April 23, 2025 |
|
| CHECK THIS PAGE PERIODICALLY FOR CHANGES |
| HOME | MONTHLY MEETINGS | March 25, 2024 Banquet | BOARD MEMBERS | Braggin' Board |
|---|---|---|---|---|
| Hazard Reports N Santiam River |
FISH COUNTS, Water level & ODFW REPORTS |
|
CHECK IN AND LET GLENN KNOW IF YOU ARE PLANNING TO PARTICIPATE ! ! ! Membership in NSRGA is not required to participate. New boaters and passengers will need to sign a Release and Liability Waiver form. Contact GLENN at nsrga@wvi.com If you are planning participate ( month, 2025)
or if you will arrange your own shuttle. |
Stayton Bridge Ramp In past years when we floated Stayton to Green's Bridge, we had options for some to take out at Shelburn Ramp (also known as Buell-Miller). If this is your choice, please let us know so I can let Bob Johnston know he should swing by on his way from Green's Bridge to Stayton to pick you up. The other option is to arrange your own shuttle. |
Bob will be at the Green's Bridge ramp around 9:00 AM and will plan to leave the Green's Bridge about 9:30 AM to shuttle back to the Stayton Bridge Ramp for the 10:00 AM launch. Bob will swing by the Shelburn Ramp for those who have request shuttle from Shelburn. |
||
Unload your boat early at the launch site, then transport your trailer to your take-out point for a shuttle back to Stayton Bridge.
|
List of participants registered for the May 3, 2025 LTR Names posted as received.= = = The following names are from the sign-up sheet gathered at the April 23,2025 meeting or recently received by email or phone call. ** = boaters who have requested shuttle from Green's Bridge Jon Beilstein (Chief River Guide) ** Rick Parr (float with Jon Beistein) Nick Brown (new member) ** David Getner ** Bob Lusk ** John Mayernik ** |
NOT PARTICIPATING: Mike Ferris and Glenn Tadina will not be participating on the May 3, 2025 LTR due to previous commitments. |
||
|
|
|||
|
|
|
|
SIGN POSTED AT GREENS BRIDGE LAUNCH OK NAVIGATION FOR DRIFT BOATS. |
Information in this section was posted Greens Bridge to I-5 ramp will be checked before the March 1, 2025 LTR * * * * * * * * * * * * Check the Hazard Reports N Santiam River page. Lane and Linn County Sherriff's River Patrol report : pending |
| GREEN'S BRIDGE LAUNCH AREA : The following photos were taken February 16 & 17, 2024 |
Entrance to Green's Bridge launch area |
Half way down entrance |
Looking upstream, launch area used to be gravel February 17, 2024 |
Upstream edge of launch areaFebruary 17, 2024 |
downstream edge of launch area |
![]() N end of launch Feb 17 2024 |
![]() Another view near bottom barrier, above the water line of photo on left |
![]() Upstream edge of launch area March 12, 2024 |
|
|||
![]() |
|
![]() |
![]() |
| Top of Bridge view | Top of Bridge view | Top of Bridge view | |
|
|
|
|
For those who want to add GPS directions for Buell-Miller ramp, addresst is 40510 Hess Rd. Scio OR 97574 / Buell-Miller ramp is also know as the Shelburn ramp & Hess Ramp |
|||
|
|
|
Photos to be added |
Ready to launch boats at Mehama boat ramp May 2019 |
|
BOAT RAMPS click on driving directions for additional map detail |
MAPS FOR NORTH SANTIAM BOAT RAMPS: North Santiam Boat Ramps: Buell-Miller boat ramp: |
| Stayton Ramp | |||
|---|---|---|---|
![]() Stayon ramp 4-5-2019 |
![]() 9-24-2019 |
more ramp progress photos coming. Re-building this project was started Sept, 2019 | re-building photos misplaced and will be added when located. |
page updated May 30, 2024 |